Kitchen reno update:
The past three days worth of work has all been behind the scenes (or, more accurately, above the ceiling and below the floor!)
Electrical rewiring in these two spaces has been a time consuming challenge for the crew. We added so many more switches, outlets, recessed lights, and commercial grade appliances so the grid had to be gussied up to handle it all. We are still waiting on special electrical wire to come in tomorrow for the wall oven.
One of the crew has been drywalling the significant number of holes they had to make in the ceiling to thread wire as well as repairing all of the drywall that had to be cut off the walls to remove the previous tile. Tomorrow is sanding day and we plan to zip ourselves out until the dust has literally settled (we have several construction zipper thingies that act as a barrier to the rest of the house.)
We’ve made two significant game time changes in the design. One is that instead of going with a full slab as a backsplash, which I desperately wanted, we are instead going with a handmade tile with lots of color variation. Lots of reasons for the change, but it came down mostly to all the seaming that would have needed to be done to extend the slab all the way up to the ceiling. I really can’t stand seams and will barely be able to tolerate the one that we must have in the island.
So, today we picked the tile out and now we are trying to settle on a matching Schluter because the tile does not come with a finished edge or a bull nose. And the grout, so many choices. Too many choices.

The second change we made is to eliminate all of our upper cabinets. My spouse is not thrilled that I made the decision after we put together all the upper cabinets, but better late than never. We will likely go with a 3-in thick walnut run on either side of the window.

There is a small, very remote chance the new floors will be laid in Friday. Fingers crossed.